High speed Designs - Part 23 (What signal integrity tests are to be done on production boards/during production?)

High speed Designs - Part 23 (What signal integrity tests are to be done on production boards/during production?)

Whether it be a initial prototype or a production unit, performing signal integrity tests is very important. 

One might ask, do we need to perform all these tests on all the boards? No, at least for the initial set of boards perform all the tests and later do a random sampling. But these tests are definitely mandatory, especially if this is first set of production lot. For future production, random sampling can be done for testing. Also, these tests are necessary, if the FAB house is changed in between the production lots or some reason. One thing is clear, the role of signal integrity engineer is very critical till production boards closure.

Post a Comment

0 Comments